Component Implementation

Component Implementation

Component Documentation

1 - ArchGlbPrm Review


Overview

Summary Sheet
Synergy Project


Sheet 1: Summary Sheet
























Rev 7.020-Apr-15

Peer Review Summary Sheet


























Synergy Project Name:


kzshz2: Intended Use: Identify which component is being reviewed. This should be the Module Short Name from Synergy Rationale: Required for traceability. It will help to ensure this form is not attaced to the the wrong change request. AR999A_ArchGlbPrm_Impl
Revision / Baseline:


kzshz2: Intended Use: Identify which Synergy revision of this component is being reviewed Rationale: Required for traceability. It will help to ensure this form is not attaced to the the wrong change request. 1.2.0

























Change Owner:


kzshz2: Intended Use: Identify the developer who made the change(s) Rationale: A change request may have more than one resolver, this will help identify who made what change. Change owner identification may be required by indusrty standards. Kathleen Creager
Change Request ID:


EA4#868





























kzshz2: Intended Use: Intended to identify at a high level to the reviewers which areas of the component have been changed. Rationale: This will be good information to know when ensuring appropriate reviews have been completed. Modified File Types:















































































































































































kzshz2: Intended Use: Identify who where the reviewers, what they reviewed, and if the reviewed changes have been approved to release the code for testing. Comments here should be at a highlevel, the specific comments should be present on the specific review form sheet. Rationale: Since this Form will be attached to the Change Request it will confirm the approval and provides feedback in case of audits. ADD DR Level Move reviewer and approval to individual checklist form Review Checklist Summary:






















































Reviewed:































MDD


Source Code


PolySpace









































Integration Manual


Davinci Files








































































Comments:

AR999A design was re-baselined with "global" attribute on the constants. Impl change was to bring the new






design subproject version in to the implementation project in Synergy; no impact on any implementation files.



















































































General Guidelines:
- The reviews shall be performed over the portions of the component that were modified as a result of the Change Request. (Note: If this peer review form was not
completed for pervious versions of this component, the Change Owner should review the entire component and complete the checklist in its entirety prior and check
the form into Syngery. This may be done prior to reviewing the modifications for this Change Result)
- The Change Owner shall responsible for completing the entire checklist (Pre and Group review items) prior holding the initial group review.
- New components should include FDD Owner and Intergator as apart of the Group Review Board (Source Code, Integration Manual, and Davinci Files)
- Select "Yes" and add "N/A" to the comments for checklist items that are not applicable for this change
- Enter any rework required into the comment field and select No. When the rework is complete, review again using this same review sheet and select Yes. Add date and additional comment stating that the rework is completed.
- To review a component with multiple source code files create a Source code tab for each source file.
- .h file should be reviewed with the source file as part of the source file.





















Sheet 2: Synergy Project

Peer Review Meeting Log (Component Synergy Project Review)



















































Quality Check Items:




































Rationale is required for all answers of No










Prep project is updated from correct basline








Yes
Comments:










































Project contains necessary subprojects








Yes
Comments:










































Project contains the correct version of subprojects








Yes
Comments:










































Design subproject is correct version








Yes
Comments:











































General Notes / Comments:



























































LN: Intended Use: Identify who were the reviewers and if the reviewed changes have been approved. Rationale: Since this Form will be attached to the Change Request it will confirm the approval and provides feedback in case of audits. KMC: Group Review Level removed in Rev 4.0 since the design review is not checked in until approved, so it would always be DR4. Review Board:


























Change Owner:

Kathleen Creager


Review Date :

06/23/15
































Lead Peer Reviewer:


Lucas Wendling


Approved by Reviewer(s):



Yes































Other Reviewer(s):