Nm Integration Manual

Integration Manual

For

Nm

VERSION: 1

DATE: 02/02/17

Prepared By:

Software Group,

Nexteer Automotive,

Saginaw, MI, USA

Location: The official version of this document is stored in the Nexteer Configuration Management System.

Revision History

Sl. No.DescriptionAuthorVersionDate
1Initial versionLucas Wendling1.002/02/17

Table of Contents

1 Abbrevations And Acronyms 4

2 References 5

3 Dependencies 6

3.1 SWCs 6

3.2 Global Functions(Non RTE) to be provided to Integration Project 6

4 Configuration REQUIREMeNTS 7

4.1 Build Time Config 7

4.2 Configuration Files to be provided by Integration Project 7

4.3 Da Vinci Parameter Configuration Changes 7

4.4 DaVinci Interrupt Configuration Changes 7

4.5 Manual Configuration Changes 7

5 Integration DATAFLOW REQUIREMENTS 8

5.1 Required Global Data Inputs 8

5.2 Required Global Data Outputs 8

5.3 Specific Include Path present 8

6 Runnable Scheduling 9

7 Memory Map REQUIREMENTS 10

7.1 Mapping 10

7.2 Usage 10

7.3 Non RTE NvM Blocks 10

7.4 RTE NvM Blocks 10

8 Compiler Settings 11

8.1 Preprocessor MACRO 11

8.2 Optimization Settings 11

9 Appendix 12

Abbrevations And Acronyms

AbbreviationDescription

References

This section lists the title & version of all the documents that are referred for development of this document

Sr. No.TitleVersion

Dependencies

SWCs

ModuleRequired Feature

Note : Referencing the external components should be avoided in most cases. Only in unavoidable circumstance external components should be referred. Developer should track the references.

Global Functions(Non RTE) to be provided to Integration Project

Configuration REQUIREMeNTS

The Nm component is provided with a template file for configuration of the module. This template file should be copied into the project for inclusion in the build after adapting the template for the needs of the project. Additionally, the leading underscore should be removed from this file. This file can be found in the “tools/template/” folder of this component. For details on how to adapt, third party documentation found in this component can be referenced as needed.

Build Time Config

ModulesNotes

Configuration Files to be provided by Integration Project

N/A

Da Vinci Parameter Configuration Changes

ParameterNotesSWC

DaVinci Interrupt Configuration Changes

ISR NameNotes

Manual Configuration Changes

ConstantNotesSWC

Integration DATAFLOW REQUIREMENTS

Required Global Data Inputs

Required Global Data Outputs

Specific Include Path present

Yes

Runnable Scheduling

Third party documentation can be referenced as needed.

InitScheduling RequirementsTrigger
RunnableScheduling RequirementsTrigger

.

Memory Map REQUIREMENTS

Mapping

Memory SectionContentsNotes

* Each …START_SEC… constant is terminated by a …STOP_SEC… constant as specified in the AUTOSAR Memory Mapping requirements.

Usage

FeatureRAMROM

NvM Blocks

Compiler Settings

Preprocessor MACRO

Optimization Settings

Appendix

Last modified October 12, 2025: Initial commit (1fadfc4)