EcmOutpAndDiagc Integration Manual

Integration Manual

For

EcmOutpAndDiagc

VERSION: 2

DATE: 02/09/16

Prepared By:

Software Group,

Nexteer Automotive,

Saginaw, MI, USA

Location: The official version of this document is stored in the Nexteer Configuration Management System.

Revision History

Sl. No.DescriptionAuthorVersionDate
1Initial versionLucas Wendling110/07/15
2
2Updated with startup tests for EI and Pseudo Error InjectionAvinash James202/09/15

Table of Contents

1 Abbrevations And Acronyms 4

2 References 5

3 Dependencies 6

3.1 SWCs 6

3.2 Global Functions(Non RTE) to be provided to Integration Project 6

4 Configuration REQUIREMeNTS 7

4.1 Build Time Config 7

4.2 Configuration Files to be provided by Integration Project 7

4.3 Da Vinci Parameter Configuration Changes 7

4.4 DaVinci Interrupt Configuration Changes 7

4.5 Manual Configuration Changes 7

5 Integration DATAFLOW REQUIREMENTS 8

5.1 Required Global Data Inputs 8

5.2 Required Global Data Outputs 8

5.3 Specific Include Path present 8

6 Runnable Scheduling 9

7 Memory Map REQUIREMENTS 10

7.1 Mapping 10

7.2 Usage 10

7.3 Non RTE NvM Blocks 10

7.4 RTE NvM Blocks 10

8 Compiler Settings 11

8.1 Preprocessor MACRO 11

8.2 Optimization Settings 11

9 Appendix 12

Abbrevations And Acronyms

AbbreviationDescription
DFDDesign functional diagram
MDDModule design Document
FDDFunctional Design Document

References

This section lists the title & version of all the documents that are referred for development of this document

Sr. No.TitleVersion
1FDD – CM104A EcmOutpAndDiagcSee Synergy subproject version
2Software Naming ConventionsProcess 04.02.00
3Software Coding StandardsProcess 04.02.00

Dependencies

SWCs

ModuleRequired Feature

Note : Referencing the external components should be avoided in most cases. Only in unavoidable circumstance external components should be referred. Developer should track the references.

Global Functions(Non RTE) to be provided to Integration Project

EcmOutpAndDiagcInit1

EcmOutpAndDiagcInit3

EcmOutpAndDiagcInit4

Configuration REQUIREMeNTS

Build Time Config

ModulesNotes
None

Configuration Files to be provided by Integration Project

Da Vinci Parameter Configuration Changes

ParameterNotesSWC

/Renesas/EcucDefs_Mcu/Mcu/

McuModuleConfiguration/McuEcmErrorSourcesCfg

Refer FDD and make configuration as per the config file MicroControllerDiagnosticsConfig.xlxs

DaVinci Interrupt Configuration Changes

ISR NameVIM #Priority DependencyNotes
None

Manual Configuration Changes

ConstantNotesSWC
None

Integration DATAFLOW REQUIREMENTS

Required Global Data Inputs

None

Required Global Data Outputs

None

Specific Include Path present

Yes

Runnable Scheduling

This section specifies the required runnable scheduling.

InitScheduling RequirementsTrigger
EcmOutpAndDiagcInit1See CM100AOnce At Init (Non-RTE)
EcmOutpAndDiagcInit2NoneOnce At Init (RTE)
EcmOutpAndDiagcInit3See CM100AOnce At Init (Non-RTE)
EcmOutpAndDiagcInit4See CM100AOnce At Init (Non-RTE)
RunnableScheduling RequirementsTrigger
CtrlErrOut_OperN/A (Server Runnable)On Invocation

.

Memory Map REQUIREMENTS

Mapping

Memory SectionContentsNotes

* Each …START_SEC… constant is terminated by a …STOP_SEC… constant as specified in the AUTOSAR Memory Mapping requirements.

Usage

FeatureRAMROM

Table 1: ARM Cortex R4 Memory Usage

NvM Blocks

*See DataDict.m

Compiler Settings

Preprocessor MACRO

None

Optimization Settings

None