| Instructions for Functional Design Package Peer Review | 
 | 
 | 
| 
 | 
 | 
 | 
| PRE-MEETING | 
 | 
 | 
| 
 | Function Owner | Confirm that requirements are reviewed and approved PRIOR to the FDP peer review | 
| 
 | Function Owner | Start with latest version of the template for any "first reviews" - Continue to use existing temmplate for re-reviews | 
| 
 | Function Owner | Provide the functional design package (changed documents) to the invited attendees 1-2 working days in advance of review | 
| 
 | Function Owner | Notify the assigned peer reviewer and make sure they are prepared to do their function in the meeting | 
| 
 | Function Owner | Identify necessary attendance and invite to meeting | 
| 
 | Function Owner | Complete the "Author" column information for sections 1 through 3 prior to the review | 
| 
 | Function Owner | Complete the attendance invitation list in section 5 | 
| 
 | Function Owner | For Re-reviews only: Complete the column "remarks by author" to identify actions taken to address items found in earlier reviews. | 
| 
 | 
 | 
 | 
| DURING MEETING | 
 | 
 | 
| 
 | Function Owner | Present document changes to the review team | 
| 
 | Peer Reviewer | Capture attendance of the review | 
| 
 | Peer Reviewer | Capture actions and issues in section 4. Identify issue summary, Document type, Reference (Requirement ID, section number, etc), Defect Type and indicate status as "OPEN" | 
| 
 | 
 | 
 | 
| POST MEETING | 
 | 
 | 
| 
 | Function Owner | Follow up on all "open" items. Update "Summary of Resolution" to indicate what was done or decided. | 
| 
 | Function Owner | Schedule follow up review OR review open items with peer reviewer and obtain agreement to close | 
| 
 | Peer Reviewer | Close change request in system and confirm all associated tasks are complete. Upload peer review checklist (this document) with any FDP updates | 
| Technical Review Checklist - Template Version 01.00.05 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Product Name | Electric Power Steering | Electrical Arch. | 4 | Review Scope | Defect Type | Numbers | 
 | 
 | 
 | 
 | 
 | Yes | Closed | FR | 
| Function Name | ES238A_HwAgArbn | Baseline | 1.0.0 | Initial release. Includes arbitration of two channels based on correlation status and signal availability | Requirement | 0 | 
 | 
 | 
 | 
 | 
 | No | Rejected | FDD | 
| Author | Kushion | 
 | 
 | Interface | 0 | 
 | 
 | 
 | 
 | 
 | NA | Open | Model | 
| 
 | 
 | Effort | Design | 0 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | FMEA | 
| 
 | 
 | Review Effort(Hrs.) | 1.00 | Standards | 2 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | *.m File | 
| 
 | 
 | Corr+Verf effort(Hrs.) | 
 | Documentation | 1 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | Cal Process | 
| 
 | 
 | Total Effort (Hrs.) | 1.00 | Others | 0 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 
 | 
 | 
 | 
 | 
 | 
 | Total | 3 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Checklist No. | Description of Check | Author:
This column is for Self review. Author shall fill Yes/No/NA against each point in checklist.
Author | Author:
This column is for reviewer. Reviewer shall fill Yes/No/NA against each point in checklist.
Reviewer | Author:
Detailed Description of the finding shall be provided by the reviewer.
Description of finding by reviewer | Author:
Defect type to be selected.
Defect Type | Author:
What action is taken to fix the comment & other remarks need to be filled by author. Remarks By Author | Author:
Data in this column shall be filled by reviewer after checking whether the rework is completed. Status | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 1 | Section 1: TECHNICAL CHECK | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 1.1 | Confirm that all signal inputs into the FDP (Functional Design Package) are contained within and exactly named as the "Available_Nexteer_Signals.m" states. | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 1.2 | Confirm any removed signal inputs from the design have been removed from the "Available_Nexteer_Signals.m" file. | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 1.3 | Confirm all signals and parameters (outputs, calibrations, constants, non-volatile memory) used in the *.m file and the design conform to the AutoSAR naming convention documentation. | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 1.4 | Confirm *.m file has been provided to the "Available_Signal_Names" Author. | Yes | 
 | 
 | 
 | Will be provided when in Synergy per new process | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 1.5 | Confirm Electrical Systems interface map is updated to reflect the FDP (signal IO) | Yes | 
 | 
 | 
 | Map Updated | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 2 | Section 2: Safety CHECK | Author:
This column is for Self review. Author shall fill Yes/No/NA against each point in checklist.
Author | Author:
This column is for reviewer. Reviewer shall fill Yes/No/NA against each point in checklist.
Reviewer | Author:
Detailed Description of the finding shall be provided by the reviewer.
Description of finding by reviewer | Author:
Defect type to be selected.
Defect Type | Author:
What action is taken to fix the comment & other remarks need to be filled by author. Remarks By Author | Author:
Data in this column shall be filled by reviewer after checking whether the rework is completed. Status | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 2.1 | Confirm that the functional DFMEA is up to date based on the design in the current package. | NA | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 2.2 | Confirm that Safety requirements (ASIL A - D) are referenced in the design documents. | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 3 | Section 3: Lessons Learned | Author:
This column is for Self review. Author shall fill Yes/No/NA against each point in checklist.
Author | Author:
This column is for reviewer. Reviewer shall fill Yes/No/NA against each point in checklist.
Reviewer | Author:
Detailed Description of the finding shall be provided by the reviewer.
Description of finding by reviewer | Author:
Defect type to be selected.
Defect Type | Author:
What action is taken to fix the comment & other remarks need to be filled by author. Remarks By Author | Author:
Data in this column shall be filled by reviewer after checking whether the rework is completed. Status | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 3.1 | Have functions depending upon system state been reviewed for need to be executed at the 2ms rate to avoid system lag issues? | Yes | 
 | 
 | 
 | Function runs in all states, so no concern | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 3.2 | Have all diagnostics (NTCs) been confirmed to show logic to invoke a diagnostic "PASS" for control of the status byte at the customer level. | NA | 
 | 
 | 
 | No NTCs | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 3.3 | Has the requirements traceability steps used the RMI steps as defined in the FDD authoring spec to generate the traceability report? | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 3.4 | Has the requirements traceability report been verified to only contain ONLY requirements from the FR. | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 3.5 | Confirm that all PIM that does NOT have an initialization value of zero is initialized in an INIT function. | NA | 
 | 
 | 
 | No PIM initialized to non-zero value | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 3.6 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 3.7 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4 | Section 4: Issues / Actions Identified | Document | Reference | Summary of resolution | Author:
Defect type to be selected.
Defect Type | Author:
What action is taken to fix the comment & other remarks need to be filled by author. Remarks By Author | Author:
Data in this column shall be filled by reviewer after checking whether the rework is completed. Status | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.1 | Rename variables with counter to 'Cntr' | Model | 
 | Corrected during meeting | Standards | 
 | Closed | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.2 | Elaborate Long Names | *.m File | 
 | Corrected during meeting | Standards | 
 | Closed | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.3 | Rerun reqmt traceability after FR is baselined | 
 | 
 | Reran with Review View after baselined | Documentation | 
 | Closed | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.4 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.5 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.6 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.7 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.8 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.9 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.10 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.11 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.12 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.13 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.14 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.15 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.16 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.17 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.18 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.19 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.20 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.21 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.22 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.23 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.24 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 4.25 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 5 | Section 5: APPROVALS | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Role | First Review | Date | Attendance | Approval? | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Function Owner* | Kushion | 7/14/2015 | Yes | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Peer Reviewer* | Amberkar | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| EPDT Engineer | McCann | No | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| ES Engineer | Patel | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Software Lead | Rijvi | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Hardware Lead | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Test Lead | Chinchalpet | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Safety Lead | Millsap | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Role | Second Review (if required) | Date | Attendance | Approval? | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Function Owner* | Muragesh Asundi | 8/14/2015 | Yes | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Peer Reviewer* | Spandana Balani | Yes | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| EPDT Engineer | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| ES Engineer | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Software Lead | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Hardware Lead | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Test Lead | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Safety Lead | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Role | Third Review (if required) | Date | Attendance | Approval? | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Function Owner* | <Owner Name> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Peer Reviewer* | <Name> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| EPDT Engineer | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| ES Engineer | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Software Lead | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Hardware Lead | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Test Lead | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Safety Lead | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Role | Fourth Review (if required) | Date | Attendance | Approval? | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Function Owner* | <Owner Name> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Peer Reviewer* | <Name> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| EPDT Engineer | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| ES Engineer | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Software Lead | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Hardware Lead | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Test Lead | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Safety Lead | <Name - if invited> | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| Role | Add more if necessary | Date | Attendance | Approval? | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| P.S.: | Yes indicates adherence | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 
 | No indicates non-adherence, reviewer shall provide suitable comments at the end of this document for each point. | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
| 
 | NA indicates not applicable | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 | 
 |